Harbin Electric Company Limited
We have established relations with three of the largest Chinese power plant equipment manufacturing companies.
Harbin Electric Company Limited, is a Chinese enterprise engaged in the research and development, manufacturing, and construction of power plant equipment.
HEC possesses the whole series of Turbo-generator with Turbine products ranging from 3MW to 1100MW class. new domestic records for thermal power products.
Hydro turbines include: Francis, Kaplan, Bulb, Pump-Storage, Pelton, Deriaz, and Huge Pump. The max Dia of runner for Francis turbine is 10.44m, the max output of Francis turbine is 812MW and the max Dia of runner for Kaplan turbine is 10.4m.
Shandong Jinan Power Equipment Factory Co., Ltd.
Shandong Jinan Power Equipment Factory manufactures and distributes power equipment. The Company produces turbines, generator sets, high voltage motors, and other products up to capacity of 300MW.
Dongfeng Electric Corporation (DEC)
Dongfeng Electric Corporation (DEC) is one of the backbone enterprise groups directly supervised by Chinese Central Government.
Mass production of thermal power equipment with unit capacity of 1000MW, 660MW, 600MW and 300MW, while the medium to small size units such as 200MW, 135MW, 100MW, 50MW, 25MW are still kept in the product lines.
The Hydro Power product range covers Franciss type, tubular type, Kaplan type, Pelton type and pump-storage type etc. and we also have the strong R&D capability for 1000MW capacity hydro power units.
CREDENTIAL
JB ENTERPRISE REFERENCE LIST | S/N | CUSTOMER | CAPACITY | OEM/MAKE | SCOPE OF WORK | YEAR OF EXECUTION | 1 | ACB India Ltd. Korba (On-going Project) | 135 MW | Harbin Make | - Major COH (Turbine, Gen. Valves) of U1
- Repair of Generator Rotor, Deblading-Reblading and repair of 17th & 18th stage turbine rotor blades.
- Turbine Governing valve 2&3 repair & refurbishment work, Turbine rotating blades fixed seals Ring replacement and Generator Rotor Slot
- Wedges Removal and Cleaning
| 2024 | 4 | JSW Ind Barath, Orissa (On Going Project) | 2 x 350MW | Harbin Make | - Manpower support for O&M services along with
- tools & consumables
- Erection and Commissioning of U2 Turbine, Generator, valves, TDBFP and its auxiliaries
- Major Overhauling of U1Turbine, Generator, valves, TDBFP and its auxiliaries
| 2024 | 5 | JSW Barmer (On-going Project) | 8x135MW | DEC make | Repair of LP Rotor U#4 | 2024 | 7 | JSW Barmer | 135MW | JINAN China | Repair of Generator Rotor U#8 | 2024 | 9 | Vedanta Jharsuguda | 135MW | SEC | Generator Slip Ring Replacement work of U#8 | 2024 | 10 | Nirma Ltd, Bhavnagar | 22MW | ANDRITZ | Expert Supervision during GEN OH and Electrical testing and Repair of Gen Rotor | 2023 | 11 | Nirma Ltd, Bhavnagar | 70MW | BHEL | Expert Supervision during GEN OH and Electrical testing and Repair of Gen Rotor | 2023 | 12 | Shyam Metallics & Energy Ltd | 30MW | Shandong Jinan Power | Generator Rotor Bottom Bar Replacement | 2023 | 13 | Lanco Power Limited, Anpara | 600MW | DEC | Identification of Generator Bar Leakage TOP/Bottom | 2023 | 14 | Vedanta Balco | 135MW | SHANDONG JINAN | U#1 Overhauling of Generator Rotor and Stator | 2023 | 15 | Vedanta Balco | 135 MW | SHANDONG JINAN | Overhauling of Generator Rotor and Stator of U2 | 2023 | 16 | Indonesia | 350MW | Harbin Make | Generator Stator 2Nos Top Bar installation work | 2023 | 17 | Sri Lanka | 300MW | Harbin make | Slipring (collector ring) Granding and polishing on site | 2023 | 18 | JSW Barmer | 135MW | DEC | LP Turbin OH, Rotor Replacement and Bearing inspection 1 to 5 | 2023 | 19 | JSW Vijayanagar | 300MW | SEC | SBU2 U1 TG & AUX COH WORK | 2023 | 20 | DEC | 350MW | DEC | Expert Supervision Service of 350MW Turbine COH | 2023 | 21 | JSW Barmer | 135MW | Shandong Jinan Power | Generator Capital OH & Gen Elec Testing & Repair | 2023 | 22 | JSW Barmer | 135MW | Shandong Jinan Power | Supply of Generator Slot Wedges | 2023 | 23 | SANDURE MAGANASE | 32MW | Shandong Jinan Power | Repair of Generator Rotor & Retaining Ring Removal and Inspection Work | 2023 | 24 | NIMBOL CEMENT PLANT | 4.72MW | QJPS Make | Supply of QJPS Make Turbine Spares | 2023 | 25 | JSW Barmer J | 135MW | Shandong Jinan Power | Generator Rotor Thread in-out, Electrical Testing and Slot wedge Replacement | 2023 | 26 | SW Barmer | 135MW | Shandong Jinan Power | Repair of Generator Stator and Rotor | 2023 | 27 | Mukund Ltd. | 15MW | Shandong Jinan Power | Retaining Ring Removal and assembly work | 2023 | 28 | Adani Power Ltd, Godda | 2X800 MW | DEC | Deputation of C&I Expert for Commissioning of Unit 2 TDBFP System | 2023 | 29 | JSW Barmer | 135MW | Shandong Jinan Power | Supply of Shandong Jinan Make Generator Spares | 2023 | 30 | JSW Barmer | 135MW | Shandong Jinan Power | Servicing and testing of Generator Stator and Rotor | 2023 | 31 | JSW Barmer | 135MW | Shandong Jinan Power | Generator Stator Fault Repair | 2023 | 32 | JSW Ratnagiri | 300MW | SEC | Repair of Generator Exciter Rotor | 2023 | 33 | KPCL Nagjhari Power House, Karnataka | 150MW | Andritz make | Repair and Rectification of Stator Winding Failure 150MW U#4, Generator | 2023 | 34 | Sembcorp Energy India Limited, Nellore | 2 x 660MW | Harbin Electric | Expert Supervision of Capital Overhaul | 2022 | 35 | JPL Jhajjar | 660 MW | DEC | Generator Inspection of U#1 & Generator Rotor CC Bolt Repair work | 2023 | 36 | Adani Power Ltd, Godda | 2X800 MW | DEC | Deputation of C&I Expert for Commissioning of Unit 1 TDBFP System | 2023 | 37 | JSW Barmer | 8x135 MW | DongFang Electric | LP Turbine Last stage complete Blade Replacement | 2022 | 38 | RKM Powergen, Chhattisgarh | 4x360 MW | Harbin Electric | Stator and Rotor repair and Erection/ Commissioning | 2021 | 39 | RKM Powergen, Chhattisgarh | 4 x 360MW | Harbin Electric | Supplier of OEM Turbine Spares | 2021 | 40 | JSW Energy, Barmer | 8x135MW | Shandong Jinan Power | Repair and Commissioning of Generator Rotor and Stator | 2023 | 41 | JSW Energy, Barmer | 8x135 MW TPP | Shandong Jinan | Generator Rotor Retaining Ring and Stator Testing and Servicing | 2023 | 42 | Vedanta Aluminum, Lanjigarh | 3x50MW | Harbin Electric | Life Assessment of Power Plant Equipment including Boiler, Turbine & Generator | 2022 | 43 | SKS Power Generation Chhattisgarh Limited, Raigarh | 4x300MW | Harbin Electric | Supplier of OEM Spare Parts | 2023 | 44 | ACB (India), Raigarh | 2x135MW | Harbin Electric | Supplier of OEM spare parts | 2022 | 45 | SKS Power and Ispat, India, Raigarh | 3x30MW | Shandong Jinan Power | Supplier and commissioning of Generator Rotor | 2022 | 46 | Telangana State Power Generation Co. Jurala Hydro, Revualapalli | 6x39MW Hydro Project | Harbin Electric | Complete Stator and Rotor Winding with erection and commissioning | 2021 | 47 | Congo Africa | 30 MW Hydro Power Project | Harbin Electric Intl. Co. Ltd | Generator Stator Rotor and Transformer Repair. | 2022 | 48 | JSW- Barmer | 8x135 MW | Shandong Jinan | VPI Generator Stator Earth Fault Repair at site. | 2022 | 49 | NTPC Mauda | 500MW | BHEL | Generator Rotor CC Bolt Repair | 2022 | 50 | Ceylon Electricity Board, Sri-Lanka | 3x300MW | Harbin Electric | Turbo Generator Slip Ring Grinding and Polishing on site | 2022 | 51 | Vedanta-Balco Korba | 4x135MW | JPEF, China | New Generator Erection and Commissioning | 2021 | 52 | Siemens | 120MW | BHEL, Siemens design | Complete Turbo Generator Rotor Rewind | 2022 | 53 | Vedanta-Balco Korba | 4x300MW | DongFang Electric | Turbo Generator Slip Ring Replacement | 2022 | 54 | Ramsarup Industries, Kharagpur WB | 20MW | Shandong Jinan Power Equipment | Repairing of Generator Rotor and Exciter stator at Site | 2023 | 55 | JSW Barmer | 135MW | Shandong Jinan | Repair of Generator Rotor | 2018 | 56 | JSW Barmer | 135 MW | Shandong Jinan | Generator Stator Repair Testing and Commissioning | 2019 |
|
|